Home/Projects/DWP Assessment Centre, Swansea
◆ Commercial case study · Public sector

DWP Assessment Centre, Swansea

VoltSecure was appointed to deliver the full electrical installation for the DWP Assessment Centre in Swansea as part of a commercial refurbishment - delivered to programme and in line with the requirements of a busy public-sector environment.

LocationSwansea
SectorPublic Sector · Cabinet Office
ServicesFull Electrical Installation
DurationProgramme-managed
DWP Assessment Centre, Swansea - Canolfan Asesu front entrance
Government framework

Scope

This project was a huge milestone for the business. The brief was the full electrical design and install for a Department for Work and Pensions office floor - a government-grade fit-out demanding independent certification, full documentation and zero interruption during handover.

We are proud to have delivered every discipline in-house, from initial mains intake and sub-main distribution through to final commissioning of the addressable fire-alarm system and disabled-alarm network.

What we delivered

  • All containment - tray, basket, trunking and conduit - installed to BS EN 61537
  • Main switchgear and sub-main distribution design, supply and install
  • Small-power distribution with RCBO protection throughout
  • DALI addressable lighting control with occupancy-sensed scene programming
  • Addressable fire-alarm system (BAFE SP203-1) - design, install, commission and handover
  • Disabled-refuge communication system to BS 5839-9
  • Full test, inspection and commissioning pack delivered at handover

Why it mattered

Public-sector estates held to Cabinet Office frameworks require full independent certification at every stage. NICEIC approval, BAFE SP203-1 certification and Constructionline Silver accreditation were prerequisites for award - every project closes with a documentary trail that insurers and Responsible Persons can rely on.

Delivering this project within schedule and to budget was a milestone for VoltSecure and a benchmark for the work we take on since.

On schedule
On budget
BAFE
Certified
DALI
Controlled lighting
◆ More case studies

Selected projects.

◆ Start a project

Got a similar brief?

Tell us the site, the scope and the timeline - we’ll come back within one working day.